Z3

The very first building of Terre Bonne Park includes offices and a Research and Development center.

Square meters

4.200

Status

Delivered

Use

Offices

About the building

The equipment includes :
Full fibre optic and cable services
No-break power supply optional
Secured access
Direct access from underground parking
Engineered to receive a technical floor

Active ceiling providing heating, cooling and acoustic performance Pre-engineered for sprinkler-installation in basement
Heating and cooling according to SIA-norms
Variable Air Volume system (SIA 382/1)
Naturally ventilated parking with CO2 detection
Solar panels for environment friendly heating of water
Heat and smoke detection

Project details

Project name
Z3

Status
Delivered

Square meters
4.200

Country
Switzerland

Location
Eysins

Start project
In 2009

Architects
MR&A and
Zimmerman

Tenant
Quotient

Delivered
2010