Z3
The very first building of Terre Bonne Park includes offices and a Research and Development center.
Square meters
Status
Use
About the building
The equipment includes :
Full fibre optic and cable services
No-break power supply optional
Secured access
Direct access from underground parking
Engineered to receive a technical floor
Active ceiling providing heating, cooling and acoustic performance Pre-engineered for sprinkler-installation in basement
Heating and cooling according to SIA-norms
Variable Air Volume system (SIA 382/1)
Naturally ventilated parking with CO2 detection
Solar panels for environment friendly heating of water
Heat and smoke detection
Project details
Project name
Z3
Status
Delivered
Square meters
4.200
Country
Switzerland
Location
Eysins
Start project
In 2009
Architects
MR&A and
Zimmerman
Tenant
Quotient
Delivered
2010