A2
Sister of the A1, A3 and A4 buildings, the A2 was part of the construction phase 2, from 2011 to 2012.
Square meters
Status
Use
About the building
The equipment includes :
Full fibre optic and cable services
No-break power supply optional
Secured access
2.500m2 per floor
Divisible from 600m2
Direct access from underground parking
Engineered to receive a technical floor
Active ceiling providing heating, cooling and acoustic performance
Pre-engineered for sprinkler-installation in basement
4 fully equipped sanitary groups and
connections for 4 pantries per floor level
Heating and cooling according to SIA-norms
Variable Air Volume system (SIA 382/1)
Naturally ventilated parking with CO2 detection
Solar panels for environment friendly heating of water
Heat and smoke detection
Project credits
Project name
A2
Status
Delivered
Square meters
7.644
Country
Switzerland
City
Eysins
Start project
In 2011
Architects
MR&A and Zimmerman
Tenants
Shire
Delivered
In 2012